Project Start-End Date: 02/2022 – 12/2023

Project Budget: 191.400,00 USD

Project Team: M. Pınar Mengüç, Cem Keskin, Ruken Karakuş, Damla Kaleli, Gökçe Tomrukçu, Merve Mermertaş, Ayşe Bayazıt Subaşı


Lahore Times Square (LTS), with a total area of 1.13 million m² and multi-layered buildings such as residential units, a hospital, offices, a school and a shopping mall, was CEEE’s premier consultancy project. Due to its scale and climatic conditions, the design, construction and operation of the buildings were highly challenging from both technical and sustainability perspectives. In this context, the project shaped CEEE’s future work.

For this purpose, CEEE developed a unique sustainability strategy and carried out several building energy simulations. In addition, passive design and life cycle analyses were conducted. The user experience was designed with ICT and IoT strategies. CEEE’s consultancy services, comprising a total of five work packages, were successfully completed.